Services and supply lines
Four product lines and two stocking services. Each entry lists scope, exclusions, deliverables and cycle.
Wiping and cleaning supplies
Daily wipe-down stock for maintenance shops and production lines.
- Includes
- Hard-roll, center-pull and low-lint paper wipers
- Reusable and disposable industrial wipers, by case or by the pound
- General-purpose degreaser and equipment cleaner, decanted to 1 gal and 5 gal containers
- Secondary-container labels and SDS for each decanted product
- Excludes
- Office and restroom janitorial supplies
- Sanitizer programs and chemical dispensing systems
- Cleaning labor
- Deliverables
- Stocked wiper and chemical shelves
- SDS set per product, by department
- Cycle
- On the route visit; decanted products ready within 5 business days of first order
Safety supplies (non-respiratory)
Hand, eye, hearing and visibility protection, packed by size.
- Includes
- Nitrile disposable gloves, incl. blue metal-detectable
- Cut-resistant gloves rated to ANSI/ISEA 105, A2 to A6
- Coated work gloves (nitrile, latex, PU dipped)
- Safety glasses, foam and corded earplugs
- ANSI/ISEA 107 hi-vis vests, Type O and Type R
- Excludes
- Respirators, dust masks and any respiratory protection
- Fall protection and confined-space equipment
- Fit testing and safety training
- Deliverables
- Size-split cases on each station rack
- Monthly glove usage by department and size
- Cycle
- On the route visit; size changes take effect the next visit
Packaging and warehouse supplies
Dock and carton line stock by the roll, case or pallet.
- Includes
- Hand stretch film, 18 in x 1,500 ft, 63 or 80 gauge, clear or tinted
- Machine stretch film, 20 in x 5,000 ft, 55 to 90 gauge
- PP strapping (1/2 in x .015 in) and PET strapping (1/2 in x .028 in), seals and buckles
- Carton sealing tape
- Thermal transfer and direct thermal pallet labels; location labels
- Excludes
- Printed corrugated cartons and produce containers
- Strapping machines, wrappers and printers
- Equipment service
- Deliverables
- Dock and carton line stock to max
- Peak-week volume added on request
- Cycle
- On the route visit; full-pallet orders in 2 to 3 business days
Shop consumables
Abrasives, welding rod and lubricants for the maintenance crib.
- Includes
- Sandpaper, sanding belts and flap discs
- Cut-off wheels and grinding wheels
- Carbon steel stick electrodes: E6011, E6013, E7018 in common diameters
- Gear oil, chain oil and general-purpose grease, decanted
- Lubricants labeled H1 by the manufacturer for equipment near food contact zones
- Excludes
- Fasteners and contractor hardware
- Stainless, aluminum and specialty filler metals
- Power tools and welding machines
- Deliverables
- Stocked crib shelves
- E7018 delivered in sealed cans
- H1 and non-H1 lubricants shelved and labeled apart
- Cycle
- On the route visit
Department rack restocking
Min and max set per item for each department rack; a route rep counts and refills.
- Includes
- Walk-through of maintenance shop, packing line, shipping dock and other departments
- Item list, min and max agreed per rack
- Weekly or biweekly counts and refill to max
- Rack labels with item, pack size and max
- Excludes
- Vending machines and locked dispensers
- Items outside the four product lines
- Ownership transfer before delivery to your rack
- Deliverables
- Count sheet left at each visit
- Monthly usage report by department (CSV and PDF)
- Quarterly min and max review
- Cycle
- Setup in 2 to 3 weeks after price schedule approval; visits weekly or biweekly
Pre-season stock build
High-use items sized from last season's usage before almond, pistachio and tomato runs start.
- Includes
- Usage review of gloves, stretch film, strapping and labels from the prior season
- Build quantity per item, agreed in writing
- Staged deliveries ahead of the run
- Reserve held in the local warehouse for call-off during the season
- Excludes
- Storage beyond the agreed season
- Items not on your price schedule
- Deliverables
- Build plan with quantities and delivery dates
- Call-off deliveries during the run
- Cycle
- Plan 8 to 10 weeks before the run starts
Rates and terms
Same terms for every account. Unit prices are set in your annual schedule.
Request a price schedule| Pricing | Per-item unit prices, annual price schedule |
|---|---|
| Restock service fee | $0 |
| Monthly minimum purchase | $750 |
| Delivery, Kings / Tulare / Fresno | Free on orders of $250 or more; own trucks |
| Delivery, rest of California | Full cases or pallets, ground freight at cost |
| Invoicing | One invoice per month, all departments |
| Payment terms | Net 30 on approved credit application |